EPOXY FLOOR FACTORY BREAKING AND TREATMENT SOLUTION
Factory floors, even though they have been used with high-quality materials, still cannot last with time.
Over a long period of use, the factory floor will appear phenomena such as: peeling paint, blistering, cracking paint surface, dampness, water absorption,...
329 Construction Company Limited was established to offer the best solutions for the factory floor.
Brief introduction of 329 factory repair unit 329
Construction Company Limited always puts "PRESTIGE - QUALITY - EFFICIENCY" as the top criterion in the construction and repair of factories in Ho Chi Minh City. Bright.
The company guarantees to bring you quality works at the lowest cost.
The company has a full capacity profile in the construction and repair of factories.
We have a team of highly specialized engineers who are proficient in designing workshops and formulating the most optimal factory construction methods.
Team of skilled construction workers, diligent and enthusiastic.
Supply and equip equipment and machinery according to modern technology.
Time of construction and handover of the project in accordance with the agreed regulations.
Comply with the provisions of the law in the construction industry.
There are engineers to supervise the project closely from the beginning to the handover.
Factory construction cost and lowest estimated cost in Saigon.
Good warranty as committed on the contract.
The main causes of damaged factory floors
The first reason: the factory floors are located in flooded areas or areas with too high humidity.
The second reason: before construction, the concrete floor is not treated with reverse waterproofing.
The third reason: construction of the factory floor with oil-based epoxy paint. When applying paint, it will create a completely sealed film, it is difficult for water vapor to pass through the surface of the paint film. Over time, when the amount of steam accumulated is large enough, it will destroy the adhesion of the epoxy coating to the concrete floor and cause peeling or blistering of the paint film.
Solution for heavily damaged workshop floors
The method to fix damaged factory floors is to use water-based epoxy paint.
Because, when constructing the factory floor with water-based epoxy paint, it will create an open, stretchable surface and allow steam to escape, so it will not peel off the top epoxy paint.
The process of handling the floor of the factory is peeling due to not applying reverse waterproofing
Step 1:
Scrape off old peeling paint, weak paint layer, blistering,...
Step 2:
Clean the entire surface completely clean of dirt and other impurities.
Step 3:
Apply 1 coat of water-based epoxy primer with Rulo to create adhesion for epoxy coating and concrete floor.
Step 4:
Apply the first water-based epoxy coating with Rulo.
Step 5:
Sand the concrete floor and treat surface defects with a specialized epoxy mortar.
Step 6:
Apply water-based epoxy paint finish.
Step 7:
Acceptance and handover of the project.
If you want to have a quality, aesthetic and competitive factory, please contact us for the earliest advice and quote:
Hotline :
☎ 0918 185 927 (Mr. Nam – NVKT1)
☎ 0917 717 428 (Mr. Nam- NVKT2)
CONSTRUCTION COMPANY LIMITED 329
Representative office: No. 870, Provincial Road 43, KP.1, Binh Chieu Ward, City. Thu Duc, Ho Chi Minh City
Email: info.xaydung329@gmail.com
Website: xadung329.com