CONSTRUCTION OF THE LIGHTING SYSTEM INSIDE THE WORKSHOP
A factory can' t afford to light the entire factory.
Thus, to have a sustainable lighting system and safety, business owners need to find out and select highly experienced contractors. What are you waiting for INTERNAL LIGHTING INSTALLATION
FACTORY
A factory can' t afford to light the entire factory.
Thus, to have a sustainable lighting system and safety, business owners need to find out and select highly experienced contractors. What are further delays without selecting nam –' s – unit of construction of construction package, renovation and repair of workshops throughout saigon and neighboring provinces.
Basic requirements in the construction of the lighting system
- Coordinate with the technical apparatus, see and understand the technical drawings approved to determine the position and height of installation and connection points of the equipment.
- Make all the details install and browser with the investor before putting it into installation.
- To understand the drawings such as water supply, fire prevention, fire and communication, communication and architecture with the purpose of not affecting the installation space and structure of the works.
Trình
- Construction of underground wiring in concrete floors
- Installation of sound in concrete floors such as lighting lights, đnè switches, power outlet, …
- Advantage
- The pipe is directly saving supplies (pipe, wire)
- Mỹ
- Does not affect the external structure (đục, vát, cắt, …)
- The construction technique shall be sent to the supervisory consulting unit in the same direction as the approved construction drawing, and complete and repair the defects in technical techniques.
- After completing the underground wiring work in the concrete floor, all will be made in writing to hand over the premises for the construction contractor to pour concrete in the concrete.
Basic techniques in the construction of underground wiring in concrete floors
- Clean clean sockets and use keo for pasting.
- Bending the tube with a dedicated spring so that the tube is not crushed, broken and done by skilled workers.
- Set the boxes for the power - feed locations to the light light, power outlet, …với, and the purpose of maintaining the maintenance process.
- Locate the upvc and plastic box by tying a 1mm steel wire into the concrete support, making sure that the tube is not affecting the capacity of the concrete floor.
- Determining the exact location of the pipe, the waiting box according to the technical drawing.
- Once the concrete is finished, cofa will be removed.
- Examine the tube by:
- Locate the intermediate boxes, use specialized wires to vent the catheter
- If the tube is blocked, it is handled or proposed to the nổi.
- Update and draw up the ngầm system.
- Công
Công.
- Check and test the entire cabinet
- The written record of acceptance of the investor' s acceptance record and the organization of acceptance to serve other defects in previous techniques before making the work.
- The contractor shall present the detailed drawing of the application to the investment monitoring unit for approval.
- To speak the pipes and canals to the power closet: the opening positions of the open - end sockets must be honed smoothly after the rubber - covered roăn, which ensure that the wires fail to fail when contact is exposed.
- Proceed to the wiring.
- All cables attached to the cabinet use the mạ copper mạ with the cose đầu marker which marks the color in order to protect the crash (the cose are pressed into the cable using the specialized hydraulic force).
- Then, conducting a dynamic & control circuit test, checking the circuit and how the cable is returned to the cabinet to ensure that there is no confusion and touch.
- To re - mark the cables according to the diagram of the diagram, update the actual connection to the principle diagram of the electricity cabinets, print drawings and put into the electricity in accordance with regulations.
- Finally clean cleaning, preparing for the next energizing.
Installation of electrical equipment.
- Construction of light switches and power outlet
- Prepare the list of parameters of devices such as type, specifications, installation positions, quantity and be approved for approval.
- Clean clean the whole box of walls with a hand or gas compressor, cut the wires and wire the wires properly, not too short or too long.
- The installation must comply with the manufacturer' s installation guidelines, the order of the wiring, the neutral line of all power outlet.
- Không or clutter of socket socket mask.
- Labeled plastics, expressing the number of ordinal numbers and circuits on the switch in the right drawing of the drawing, updating the drawing drawing of the layout of the layout layout and the principle of distribution of the distribution diagrams.
- Try using the power source to test the lighting volume before it is installed.
- Prepare a statistical statement on the construction of the approved construction.
- Locate the installation of light bulbs with other systems such as air conditioning, ventilation, fire, fire alarm,,. sound.
- Check the power switch by turning on vfa.
- Use the clock:
- Measuring the light of the light and recording and storing parameters in the record.
- Tra of power outlet.
- Test the integrity of the wiring system.
- Use the device that creates a leak: check the impact of anti - shock devices.
- Finally, record the results of the examination of the system, show the supervisory team.
- Installation of supply equipment and control equipment
Power supply and control equipment include air conditioners, ventilation fans, living water pump systems, fire water pumps, fire hydrants, fire alarm, burglar and …
Construction installation process
- Prepare the list of devices, wires, … from the electricity system to the system of categories as described above on the basis of power requirements of the system
- Installation of supply equipment for telecommunications systems and telecommunications.
- Check how electricity, the circuit, and try the operation of the control cabinets: pump, fan, isolator,.. Record the test parameters and ready for the test
- Examine the installation of equipment according to manufacturer' s instructions and ensure that no damage is caused to the equipment when operating.
Test, run the system:
Test:
- Compilation of the inspection dossier and measurement according to the written records approved by the consulting unit
- Submit the list of experimental devices, test devices tested to the q - test 3.
- Formulate and approve the testing plan for systems for approval for the investor.
- To present the contents and measures to test equipment for the supervision consultancy team.
- The contractor' s testing team does not participate in installation: engineers, skilled workers in testing & commissioning.
- After completing the work, the testing team shall send the report on the report on measurement results to the construction authority and request the construction unit to repair and fix the defects or technical errors.
- A dossier of record, this dossier shall be a compulsory part of the work completion dossier.
Thử
- Prepare the record samples and calibrate the system. In which the parameters are presented, the equipment' s criteria are catalogue and operating parameters when running.
- Compare these parameters and have a system editing system that achieves selected standards.
- The test process consists of 2 stages: run the test without loading and running
- Thử process : before loading is included in non - loading activities, this process is important and necessary to fix errors in the installation or error - making process without causing heavy damage to equipment
- Test process The following devices after running a test are not loaded and calibrated, which will be included in the loading and synchronous activity of the system.
- The operator shall record the operating parameters of the equipment such as the start line, the current line, the star / star conversion time / the pressure of the gas; to the wind flow ; the mực; định line ,.. Based on these parameters, the parameters will be calibrated to achieve the parameters of the system
The reason for choosing nam is a water construction unit for your workshop
Nam is a contractor for construction, renovation and repair of workshops. In which the electricity system is one of the most important categories in the workshop.
- Our company with many years of experience in building and repairing workshops
- A highly skilled engineer
- A highly skilled, experienced, resourceful, tình worker
- A lot of construction buildings have a large scale
- The price of competition competition, the most rational
- Contract time
- Schedule of completion of works in accordance with contracts
- A good warranty regime, ensuring the quality after the handover of the project
CONTACT US FOR THE BEST ADVICE AND OFFER
Hotline: hotline:
0918 185 927 (mr. – Nvkt)
0917 787 428 (mr Nam – Nvkt)
Office: 870 province, kp. 1, p. binh chieu, thu duc city, hcm city
Email: tongthauson@gmail. com
Website: xaydung329. comam – is a unit that specializes in building the construction of construction, renovation and repair of workshops throughout saigon and neighboring provinces.